More Details

Get in touch to know more details about our projects, meet our Projects team and get quote  

SEC - Juba PP / Tank Gauging and Protection System

Supply and commissioning of Tank Level monitoring and protection system using Radar sensor.
Guided wave Radar for overfill and redundancy.
Integration of PLC with local and remote monitoring.
Integration of system with Plant management system using OPC server and SQL database.
Workstation software and Server along with HMI interface.
System implemented: MODbus and OPC server.

Completed Year: 2015

SEC - PP8 , ABB Turbine with Flow Measurement

Integration of Flow measurements of 20 ABB Fuel skid for turbines with DCS.
Includes supply and commissioning of Ultrasonic flow measurement for 20 fuel skids.
Installation and termination with Marshaling cabinet.
Integration of PLC with local and remote monitoring.
Integration of system with Plant management system using OPC server and SQL database.
Integration with ABB plant management system.
Workstation software and Server along with HMI interface.
System implemented: MODbus and OPC server.

Completed Year: 2011

SEC South Power Plants

South Plants include Abha, Jazan, Sharourah, Najran, Tihama and Bisha.
Includes supply and commissioning of Tank Level monitoring system using Radar sensor.
Also supply of control system with PLC/SCADA to make automatic tank gauging system.
Integration of PLC with local and remote monitoring.
Integration of system with Plant management system using OPC server and SQL database.
Integration with ABB plant management system.
Workstation software and Server along with HMI interface.
System implemented: MODbus and OPC server.

Completed Year: 2008, 2010

SEC PP5 - Tank Monitoring System

Our system covers indicating/reading the Level and Temperature of Fuel Tanks at Main Control Room (DCS Control Room) and in the tank proximity for remote monitoring.
VEGA Radar was chosen for Level Measurement.
Removal of the old Electro-Mechanical Tank Level Measuring System and all components and accessories and replace it with Radar Tank Gauging System with all components and accessories required.
Completed Year: 2007