Integrated Metering & NRW Reduction Program – Al-Qassim Region

Client: NWC

Category: Water Sector

Date: 2027

Project Scope
Raissyon successfully delivered the installation, replacement, and calibration of advanced flow metering systems across the Al-Qassim Region. The project included seamless integration with Phase 1 systems to support Non-Revenue Water (NRW) reduction initiatives and enhance network monitoring and control.

This project strengthens data accuracy, operational visibility, and infrastructure efficiency across critical water assets in the region.

Scope of Work
🔹 Instrumentation Systems

  • Installation and calibration of Flow Meters

  • Data Loggers for real-time data acquisition

  • Pressure Sensors for network performance monitoring

  • Level Measuring Units for storage tanks

🔹 Mechanical Works

  • Supply and installation of piping and fittings

  • Integration of metering and monitoring devices

🔹 Civil Works

  • Construction of concrete measurement chambers

  • Site restoration and reinstatement works

🔹 Testing & Commissioning

  • System testing, calibration, and verification

  • Commissioning and operational readiness

  • Integration with Phase 1 monitoring systems

Project Impact & Benefits

  • Improved accuracy of flow measurement and network data

  • Enhanced NRW monitoring and reduction capabilities

  • Seamless integration with existing water management systems

  • Increased reliability and operational efficiency of water infrastructure