Installation of new centrifugal fuel separator systems to ensure fuel quality for power generation.

Installation of new centrifugal fuel separator systems to ensure fuel quality for power generation. Client: King Abdulaziz Military City Category: Power Generation Date: March 2021 Value: TBC Project replaced existing separator with new duty/stand-by systems offering the latest technology in centrifugal fuel separation. The scope included the design, installation and commissioning of the new separators…

Details

Major upgrade of measurement instrumentation for SWCC Southern Region connection points in line with Seawater Desalination Code

Major upgrade of measurement instrumentation for SWCC Southern Region connection points in line with Seawater Desalination Code. Client: SWCC Category: Water Sector Date: Project commenced October 2020 Value: TBC New flow meters and water quality monitoring instrumentation are being installed at 54 separate locations throughout SWCC’s Southern Region, providing high accuracy billing between SWCC and…

Details

Installation in 41 tanks of Guided Wave Radar level transmitters plus temperature and pressure transmitters for high-accuracy inventory measurement.

Installation in 41 tanks of Guided Wave Radar level transmitters plus temperature and pressure transmitters for high-accuracy inventory measurement. Client: Saudi Aramco, Riyadh Refinery Category: Oil & Gas Sector Date: December 2017 Value: TBC Project upgraded the existing tank gauging systems to provide high accuracy at minimum cost. Scope included the supply, installation and integration…

Details