Raissyon have successfully completed the installation, commissioning and hand-over of four centrifugal fuel separator systems at Tabuk power plant. The systems have been installed to replace and existing system which will be retained to provide operational support. The cleaned fuel is transferred to a storage tank and used to fuel the power generators.
Share this post